Route Construction
Installed treated wooden poles and associated 33kV line structures.

A dedicated power connection supporting industrial activity in Nyakagwe, Geita.
Project Overview
KELM constructed a 600m, 33kV overhead power line and installed a 200kVA 33/0.4kV distribution transformer substation for SOJEM Investment Ltd.
The scope covered the overhead line, transformer, protection and earthing.
What KELM Did
Installed treated wooden poles and associated 33kV line structures.
Completed conductor handling, stringing, tensioning and termination.
Installed MV switchgear components, surge protection and lightning protection.
Established the 200kVA transformer, LV interface and earthing system.