
Selected Work · Tanzania
Power infrastructure, delivered.
Recent network, substation and distribution projects completed for mining, water and industrial operations.
Explore the work ↓Project Experience
The scope, the site and what KELM delivered
Each case study records the project period, the client requirement, KELM’s delivery scope and photographs from the work.
- 8
- Detailed case studies
- 33kV
- Network experience
- TZ
- Projects across Tanzania

Butimba Treatment Plant
MV line construction, transformer substations, protection and commissioning for critical water infrastructure.
View case study →
SOTTA PAP Power Distribution
1.3km of 33kV line, a pole-mounted transformer and 1km of LV distribution.
View case study →
SOTTA 33kV Line Diversion
Construction of a 1,007.8m diversion and safe removal of the existing line.
View case study →
Mwazimba CIP
3.54km of 33kV line and an 800kVA transformer substation.
View case study →
Mawemiru Mining Substation
800m of 33kV line extension and an 800kVA transformer substation.
View case study →
SOJEM Nyakagwe Substation
600m of 33kV line extension and a 200kVA distribution substation.
View case study →
VIRA Dual Substations
500m of MV line with 500kVA and 800kVA transformer substations.
View case study →
Buckreef 33kV Relocation
Relocation of approximately 5.5km of 33kV overhead line.
View case study →Discuss A Project
Planning similar work?
Send us the scope, drawings or site requirements and our technical team will review the next step.
Contact KELM