VIRA transformer substation installation

VIRA 33kV line and dual transformer substations

A 500m MV extension serving 500kVA and 800kVA substations for separate load requirements.

February–April 2024IndustrialTanzania

Project Overview

Distributed capacity with room for operational growth

KELM constructed a 500m, 33kV overhead line and installed two transformer substations rated at 500kVA and 800kVA for VIRA 2018 Co. Ltd.

The dual-substation arrangement supports different load categories, improves distribution flexibility and provides capacity for future expansion and load balancing.

Client
VIRA 2018 Co. Ltd
Programme
February 2024 · April 2024
Application
Industrial and commercial power
Line
500m of 33kV overhead line
Substations
500kVA and 800kVA at 33/0.4kV

What KELM Did

Integrated two substations into one MV supply system

MV Extension

Surveyed and constructed the 500m overhead route with line structures and ACSR conductors.

Dual Transformers

Installed 500kVA and 800kVA transformer substations for distributed loads.

Switchgear

Installed drop-out fuses, an auto-recloser and associated MV/LV protection.

Earthing & Safety

Completed transformer earthing, surge protection and electrical safety systems.

Need capacity across multiple load centres?

KELM can engineer the network and substation arrangement as one system.