New Route Design
Surveyed and set out the diversion corridor to clear planned infrastructure works.

A new 1,007.8m corridor constructed and transferred while managing the safe removal of the existing line.
Project Overview
KELM constructed a new 33kV overhead line to divert supply away from an existing corridor affected by infrastructure development. The assignment required precise route surveying, new line construction, switching coordination, demolition and restoration.
The new route was completed, tested and integrated before the previous poles, conductors and hardware were safely removed.
What KELM Did
Surveyed and set out the diversion corridor to clear planned infrastructure works.
Installed poles, insulators, crossarms and conductors with controlled sagging and tensioning.
Planned switching and temporary arrangements to manage continuity during cutover.
Removed the old line, restored the site and completed testing and as-built documentation.